LGS Lift Passenger lift 630Kg. 8 Persons, 10 stops for your project
Item | Description | Qty | Unite Price | Total amount | |
Passenger Lift
LGS |
8 persons and 10 stop/ opening Capacity 630 kg | 01 (One) Set | 20,50,000/- | 20,50,000/- | |
Total= | 20,50,000/- |
Extra price for- a) 20 KVA voltage stabilizer 45,000/-
Extra price for- ARD Automatic Rescue Device 75,000/-
Technical Specification
Outline Specifications:
Supply of LGS Passenger Lift complete with car, Driving Motor and gearbox, Control panel, Guide rail for car and counterweight and all fixing, counterweight frame, balance weight buffer, landing doors, traveling cables, hoisting ropes, car operating panel and other accessories for lift materials complete in all respect suitable for the tropical weather having the following Technical Specification mentioned below.
2.1 Technical Specifications:
a) Type | : | passenger Lift |
b) Quantity | : | 01 set complete new |
c) Country of origin | : | China |
d) Brand | : | LGS Brand |
e) Traveling speed | : | 1.5 meter/ second |
f) Drive system | : | AC-V V VF |
g) Control | : | Highly sophisticated Micro Computer Intelligence Control system. Smooth acceleration I Deceleration no step, no vibration, no jerk, accurate leveling and Landing |
h) Operation | : | Simplex, selective collective |
i) Number of floors | : | Variety |
j) Floor designation | : | GF-1-2-3-4-5-6-7-8-9 |
k) Door type | : | 2-panel center opening the horizontal sliding door for |
l) Door opening | : | Car and all landing doors |
m) Shaft size | : | Standard |
n) Car internal size | : | Standard |
o) Travel height | : | Standard |
p) Pit Depth | : | Standard |
q) Overhead height | : | 2.00 meter |
r) Machine room lock | : | 4.50 meter |
s) Motor capacity | : | Direct above hoistway |
t) Power supply | : | Standard |
Ac-400v (plus- minus 5%) 3 phase, 50 Hz | ||
Ac-220v (plus- minus 5%) 1 phase, 50 Hz |
3. Elevator Car: Main- | : | Standard |
a) Car Ceiling lighting decoration | : | Stainless steel etching mirror |
b) Front return wall | : | Stainless steel etching mirror |
c) Side and rare wall | : | Stainless steel etching mirror |
d) Car door | : | 0 type |
e) Hand Rail | : | Natural Granite |
f) Flooring | : | VVVF door system |
g) Car Door System | : |
- f) After-sales service: 12 months of free services, our service engineer will provide preventive
maintenance of that system. They will also attend any service to solve the lift problem. - g) Warranty: 12 months from the date of installation and during this period any parts required will be supplied free of cost
- h) Spare parts: Available from our ready stock.
- j) Exclusion: Buyer is responsible to complete all necessary civil works as per provided 3 phase power supply before the start of installation work. In case the buyer fails to complete the above works in a stipulated time which causes financial losses. The small provide adequate space for the lift and accompanying accessories brought to the site and ensure safety and security for those until installation is over. The buyer should also provide sufficient office space for the engineer to carry out installation work. Landing Door/ Floor Entrance:
a) Landing Door panels (GF): Stainless steel etching mirror
Typical Floor
b)Ground Floor: Stainless steel etching mirror
Typical Floor
c)Landing sill: Stainless steel hairline5.Signal Indicators Detail:
a)Car operating panel (COP): Micro push button type
b)Car position indicator: To be combined with COP
c)The faceplate of COP: Standard
d)Hall button: Micro push button type
e)Hall position Indicators: Digital
6.Standard feature:
a)Car calls cancellation
b) Automatic By-pass at full load
c) Automatic light-fan off at rest
d)leveling protection device
e) Car top maintenance station
f) Automatic door open I close time control
g) Ventilation fan
h) Safety device
i) Fireproof door
j) Car arrival chimes
a) Full door height safety edge | : | Safety ray photocell |
b) Overload protection | : | Emergency call button |
c) 3- Way intercom | : | Emergency car lighting |
d) Emergency stop switch | : | Speed governor |
e) Interlock switch | : | Phase protection device |
f) Electromagnetic | : | Buffer |
g) Pulse Generator Error check | : | Pit stop switch |
h) pre limit and final limit switch | : |
- Reliable Multiple safety devices:
Supplies and services by others:
a) Construction of lift shaft, machine room shaft ceiling according to manufacturer’s layout, drawing, shaft
structure and shaft cladding to be supplied and designed by others ( if required).
b) Ventilation and air conditioning of machine room and hoistway, the temperature must be between +5 and
+40 degree.
c) Lighting and socket-outlet in the machine room.
d) Power supply machine room up to the main switch of lift and supply of the main switch.
e) Electrical power in the machine room for installation.
f) Temporary power supply (outlet) at landing in the immediate vicinity of the shaft, if power outlet in machine
room is not available at commencement.
g) A permanent supply of power for two weeks after the start of installation for trail runs.
h) Lighting current for the commencement of installation.
i) The cost of electrical power shall be borne by the buyer.
j) Provision of a lockable and dry room with lighting for storage of tools and materials as well as dry room
and change rooms for installation personnel.
k) Final civil Finishing work in landings door and machine room.
l) Separator beam (if required)
m) Voltage stabilizer.
n) Distribution board in the Machine room with necessary materials.
Please call me if any quarry
MM Obaydur Rahman
BSc in EEE
+8801714627402
Reviews
There are no reviews yet.